Altura Energy Commences Pipeline Replacement Program at Saddle Horse Draw Producing Helium Field

New pipeline to set the stage for scalable development across a prospective land package

Vancouver, British Columbia – March 31, 2026 – Altura Energy Corp. (TSXV: ALTU) (FRA: Y020) (“Altura” or the “Company”) is pleased to announce the commencement of the previously announced (see March 19, 2026 news release) pipeline replacement and infrastructure upgrade program at the Saddle Horse Draw target within the Pinta South Helium Field (PSHF) in the Holbrook Basin of Arizona.

Read Full Press Release

Altura Energy Icon
Altura Energy Announces Trading on OTCQB Venture Market Under the Trading Symbol ALTUF
Altura Energy Icon
Altura Energy Finalizes Farm-In Agreement on 2,560 Acres Surrounding Existing Helium Production in Holbrook Basin, Arizona